PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Exterior Framing at the 1st floor Facing North.jpg Installing copper piping at the 3rd floor Facing North-West.jpg Installing Exterior framing at the 1st Floor Facing North.jpg Installing weather strips at the curtain wall Facing South.jpg Installing weather strips throughout the Curtain Wall South Elevation.jpg Laying out block at Search Room 144 Facing South.jpg Welded clips at Elev. 1,2,3 guide rails Facing West.jpg
Previous pageNext page Installing weather strips throughout the Curtain Wall South Elevation
Installing weather strips throughout the Curtain Wall South Elevation